Controlled-pilot production vertical slice

ProductionVerticalSliceSimulator is the first fail-closed acceptance layer above the general process-to-engineering simulator. It targets one facility section:

inlet separator -> compressor -> aftercooler -> export line
                         |              |
                         +-- recycle ---+

with PCV, level valve, PSV, BDV, suction/discharge ESDVs and a flare connection

The simulator still supports arbitrary preliminary engineering modules. The vertical-slice layer adds a controlled topology and evidence contract so a partial model cannot accidentally be described as a completed production workflow.

Configure the run

Start from the executable reference facility

InletCompressionExportReferenceFacility is the regression-quality vertical slice used to prove that the complete workflow can run. It builds an actually connected process graph, rather than a collection of required tags:

It also supplies ten evidence-linked cases, an active compressor map, a dynamic anti-surge/ESD/blowdown response, an API-style blocked-outlet PSV metric, a coupled relief/blowdown/flare study, a shutdown sequence, piping rules and installed relief-device data.

InletCompressionExportReferenceFacility.Definition reference =
    InletCompressionExportReferenceFacility.build();

ProductionVerticalSliceSimulator.Result result =
    ProductionVerticalSliceSimulator.runStrictAndCompile(
        reference.getProject(),
        reference.getAutoConfigurationPolicy(),
        reference.getQualificationPolicy(),
        1,
        outputDirectory,
        null);

The embedded values and evidence are explicitly labelled synthetic. Copy the object structure, but replace every case, map, scenario, material, line, valve, PSV and flare input with controlled project evidence. The reference can qualify for a controlled software pilot; it can never grant construction approval.

Declare the numerical design policy separately from the qualification policy. This keeps calculation limits, required process objects and external evidence independently revision-controlled.

EngineeringAutoConfigurationPolicy designPolicy =
    new EngineeringAutoConfigurationPolicy("compression-design", "A")
        .addInletCompressionExportSlice(
            "20-VA-001", "20-KA-001", "20-PL-001", "20-PV-001", "20-PIT-001",
            800.0, 0.107, 120.0,       // separator basis
            20.0, 0.5,                // line velocity and pressure-gradient limits
            0.10,                     // driver margin
            3000.0, 5000.0, 7500.0, 10000.0)
        .addHeatExchanger("20-HA-001", 500.0, 25.0, 0.15,
            50.0, 75.0, 100.0, 150.0, 250.0)
        .addCompressorOperatingEnvelope("20-KA-001", 0.10, 0.05, 160.0, 0.10)
        .addReliefDevice("20-PSV-001", "20-VA-001", requiredReliefAreaMetric,
            0.110, 0.196, 0.307, 0.503, 0.785, 1.287, 1.838, 2.853);

InletCompressionExportSlicePolicy qualificationPolicy =
    InletCompressionExportSlicePolicy.builder("compression-pilot", "A")
        .processTags("20-VA-001", "20-KA-001", "20-HA-001", "20-PL-001")
        .controlTags("20-FV-001", "20-RECYCLE-001", "20-PV-001", "20-LV-001")
        .safetyTags("20-PSV-001", "20-BDV-001", "20-ESDV-001", "20-ESDV-002",
            "FLARE-HEADER-20")
        .addRequiredDynamicScenario("compressor-trip-esd")
        .addEvidenceReference("HAZOP-20-REV-A")
        .build();

ProductionVerticalSliceSimulator.Result result = ProductionVerticalSliceSimulator.runStrictAndCompile(
    project, designPolicy, qualificationPolicy, 4, outputDirectory, baselineGraph);

Every policy evidence reference must resolve to an EngineeringEvidenceRecord on the project. A reference string by itself does not pass the gate. The record must carry its revision, title, source organization and equipment or requirement link; lifecycle approval is assessed separately.

Add all normal, minimum-turndown, maximum-production, start-up, shutdown, equipment-trip, settle-out, blocked-outlet, fire and blowdown cases to the project before running. Each case must have controlled scalar inputs and evidence references. Add the required executable dynamic scenario with VerticalSliceDynamicScenarioFactory.emergencyShutdown(...), and attach the coupled relief/blowdown/flare studies selected by the approved hazard review.

For Python/JPype clients, VerticalSliceCaseMatrixFactory creates serializable Java configurators from explicit feed flow, feed pressure, feed temperature and compressor discharge-pressure inputs. applyTo(project, policy) refuses an incomplete required-type matrix. The factory changes only steady boundary conditions; start-up, trip, fire, blocked outlet and blowdown event actions and credibility must still be represented by controlled scenario definitions.

Preflight before simulation

Use ProductionVerticalSlicePreflight.assess(project, qualificationPolicy) while assembling a project. It checks the controlled definitions without running thermodynamics or the engineering loop:

Warnings retain review-required or unapproved lifecycle status. Blockers mean the numerical run must not start. runStrict(...) and runStrictAndCompile(...) throw before automatic module configuration when blockers exist. The existing run(...) method remains available for exploratory gap analysis and returns the preflight result together with the eventual qualification findings.

Every attempted vertical-slice execution also creates a SHA-256 input fingerprint over the project revision, both policy revisions, case definitions and scalar inputs, dynamic scenarios, coupled safety studies, standards and evidence. The coordinated package writes this as engineering-vertical-slice-execution-manifest.json. Changing any controlled input invalidates the fingerprint and provides a deterministic trigger for recalculation and revision-impact review.

Compressor map evidence

addCompressorOperatingEnvelope runs the active compressor map across every case and records the operating point, head, speed, efficiency, surge margin, stonewall margin, control-line margin, required recycle fraction, recycle cooler duty, discharge temperature and extrapolation flag. The common design loop constrains the minimum margins, maximum temperature and map extrapolation. Changing these limits changes the automatic-configuration fingerprint and therefore invalidates dependent calculations and package artifacts.

The module requires an active map, surge curve and stonewall curve. It does not by itself qualify vendor guarantees, starting torque, rotor dynamics or the dynamic anti-surge controller. Supply those controlled results to CompressorProtectionQualificationCalculation; its checks remain review-required and cannot replace vendor or accountable machinery approval.

Qualification gates

The generated engineering-vertical-slice-qualification.json contains nine independent gates:

  1. complete process and safety topology;
  2. complete converged case matrix;
  3. converged closed design loop;
  4. required physical design variables;
  5. compressor map and anti-surge envelope;
  6. dynamic safe-state response;
  7. coupled relief, blowdown and flare capacity;
  8. versioned standards basis; and
  9. controlled engineering evidence.

Missing data fails the relevant gate. The artifact is emitted even when the vertical-slice workflow was not configured, so downstream systems have an explicit NOT_CONFIGURED result instead of inferring success from an absent file.

When multiple modules propose the same physical variable, the later discipline module in deterministic execution order owns the applied update. This allows a network-level piping module to supersede a preliminary single-line screen without producing an artificial two-state oscillation. The loop still detects a genuine exact two-state oscillation in discrete candidates and terminates with DISCRETE_DESIGN_OSCILLATION_DETECTED.

Status boundary

Passing all nine gates means only qualifiedForControlledPilot=true. It always retains:

Production method qualification remains governed by EngineeringProductionReadinessAssessment: independent benchmarks, named-tool DEXPI qualification, accepted pilots, approved safety-lifecycle evidence and release-quality evidence are separate requirements. The assessment also has independent gates for distributed piping transients, compressor protection/machinery, valve/instrument response and installation, detailed mechanical integrity, and flare radiation/dispersion/noise. HAZOP/LOPA/SRS decisions, scenario credibility, SIL, valve failure actions, materials approval, vendor selection and final shutdown actions cannot be manufactured by the simulator.

See the controlled-pilot notebook for the executable API pattern.