HAZOP and LOPA to draft SRS handoff

HazopLopaSrsWorkflow preserves identifiers and evidence from a selected HAZOP deviation through LOPA and, when a risk gap remains, into a review-required draft safety requirements specification. The workflow performs arithmetic and completeness checks; it does not conduct or approve a HAZOP, select event frequencies, determine the tolerable-risk target, establish IPL independence, or approve a SIL target.

Credit rule

ProtectionLayerDefinition receives LOPA credit only when all of these declarations are present:

The PFD is always a user-supplied project input. An ineligible layer remains visible in the layerAssessments output but does not reduce the scenario frequency. Every failed gate is reported.

Traceable scenario

LopaScenarioDefinition scenario = LopaScenarioDefinition
    .builder("LOPA-HP-101", "HAZOP-NODE-07", "MORE-PRESSURE-03")
    .equipmentTag("V-101")
    .initiatingEvent("Inlet control valve fails open", 0.1)
    .consequence("HP separator rupture and hydrocarbon release")
    .targetFrequencyPerYear(1.0e-6)
    .frequencyBasisReference("QRA-BASIS-2026-R2")
    .addProtectionLayer(ProtectionLayerDefinition
        .builder("IPL-BPCS", "Independent pressure control", LayerType.BPCS, 0.1)
        .independentFromInitiatingEvent(true)
        .independentFromOtherLayers(true)
        .specific(true)
        .auditable(true)
        .proofTestIntervalHours(8760.0)
        .evidenceReference("BPCS-SRS-101-R4")
        .build())
    .build();

Use a stable HAZOP row/deviation identifier, not only a node title. The frequency basis reference must point to the controlled QRA, company frequency database, or approved study that supplied both the initiating-event and tolerable-frequency values.

Draft SRS input and result

HazopLopaSrsWorkflow.SrsDesignInputs srsInputs =
    HazopLopaSrsWorkflow.SrsDesignInputs
        .builder("SRS-SIF-HP-101", "SIF-HP-101", "LOPA-HP-101-R1")
        .trip("separator pressure", TripDirection.HIGH, 60.0, "bara")
        .safeState("ESDV-101 closed and HP separator isolated")
        .maximumResponseTimeSeconds(5.0)
        .votingArchitecture("2oo3")
        .proofTestIntervalHours(8760.0)
        .resetPolicy("Manual reset after process permissive and field verification")
        .bypassPolicy("Permit-controlled single-channel bypass with time limit")
        .build();

HazopLopaSrsWorkflow.Result handoff =
    HazopLopaSrsWorkflow.run(scenario, srsInputs);
SafetyRequirementSpecificationDraft draft = handoff.getSrsDraft();

The workflow credits eligible layers in order and calculates the remaining frequency. If it exceeds the supplied target, the existing LOPAResult determines the additional RRF and screening SIL band, and a draft SRS is populated with the HAZOP/LOPA identifiers, trip, safe state, response time, voting, test interval, reset policy, and bypass policy.

The draft always has REVIEW_REQUIRED, draft=true, fitForConstruction=false, and engineeringApprovalRequired=true. If existing credited layers meet the target, no additional SIF draft is created.

Review and downstream verification

  1. HAZOP team confirms scenario, cause, consequence, safeguards, and recommendations.
  2. LOPA team approves event frequency, consequence target, conditional modifiers, IPL eligibility, independence, and PFD evidence.
  3. Accountable functional-safety engineers review and approve the SRS and SIL target.
  4. Build SafetyFunctionDesign from approved reliability and architecture data.
  5. Run seeded reliability uncertainty and degraded-mode assessments.
  6. Run ClosedLoopSafetyFunction scenarios for normal demand and approved degraded cases.
  7. Link proof-test, cause-and-effect, vendor, commissioning, and validation records.

See IEC 61511-1 for lifecycle requirements and IEC 61511-3 for required-SIL determination guidance.