Skip to the content.

Source-term platform implementation status

Tracking issue: #3860. Implementation scope and consumer validation as of 2026-11-25; this does not confer qualification or replace domain review.

Delivered foundations

Architecture proposal #3861 is merged. Physics #3867, exchange contract #3868, and live integration #3870 reached master through merge commit b08d8bb59a95cf52e0565fab5c368c5548a9f27f. The latter two merged into the physics branch first.

The current implementation includes:

Legacy LeakModel behavior is preserved. The new interface now has homogeneous-equilibrium, analytical ideal-gas and explicit legacy-screening implementations. Model selection remains caller-owned; no phase-count rule silently changes the requested physics.

Remaining work before the whole issue can close

Work item Current boundary Completion evidence required
Broader transient inventory regimes Rigid equilibrium inventory supports explicit phase-selected withdrawal, ordered phase-exhaustion transitions, conservative receiving-pressure events, external heat boundaries and balance/refinement tests. The opt-in retained-phase inventory adds two-way component film transfer, donor limits, thermodynamic latent-energy accounting, live interface area and inventory feedback without reflashing the committed partition. Its explicit separate-energy path conserves gas/liquid energies and solves independent temperatures with prescribed equal-and-opposite interfacial heat transfer. Both paths retain one gas/one liquid, prescribed coefficients and fail-closed phase disappearance. Predictive and independently validated mass/heat-transfer coefficients; predictive entrainment beyond the fail-closed interface band; qualified fire/wall boundary models rather than caller-imposed duties.
Full-bore/long-pipe and non-equilibrium regimes Bounded ideal-gas and EOS-backed real-gas Fanno models cover quasi-steady one-sided constant-area single-gas pipe flow. Conservative perfect-gas and EOS-backed single-gas finite-volume units cover transient waves and line packing. The EOS-backed unit optionally includes a conservative rigid, adiabatic, well-mixed upstream gas vessel or prescribed wall heat boundaries with exact total-energy accounting and refinement evidence. Its cylindrical adapters cover fail-closed lumped capacity and conservative two-node radial resistance. An interior full-bore topology partitions the line into two adiabatic EOS-backed branches and exports opposing jets separately with total conservation and refinement evidence. It now accepts an immutable delayed linear effective-area ramp, evaluated inside conservative CFL substeps with provenance, conservation and external caller-step refinement evidence. Short-opening prescribed-slip, bounded vertical drift-flux and finite-rate phase-partition models cover one gas and one liquid within explicit screening limits. A predictive spherical-bubble transfer-zone adapter supplies bounded bubble size, phase-relative speed and residence time to Ranz-Marshall. A separate prescribed liquid-droplet adapter closes component/area/energy balances inside dilute spherical Eotvos/Weber/Reynolds/Schmidt limits. Predictive/qualified pipe-wall film coefficients, material-property sources, fire, ambient, soil or seawater thermal correlations and higher-order radial convergence; predictive fracture/opening dynamics, pipe elasticity and cross-break fluid-structure coupling; vessel nozzle loss, internal waves and phase separation; measured or predictive droplet size/slip/residence, population-balance, breakup/coalescence and entrainment models; annular/high-Weber and solid-bearing transport; independent dense-gas and multiphase validation data.
Independent qualification and dense-fluid accuracy Machine-readable evidence records distinguish applicability, limitations, evidence type and independence. The Fanno manifest retains one external analytical case with explicit error bounds. The HEM manifest retains the public STEP propane liquid-withdrawal case, six Hammer dense single-fluid CO2 restrictions and 27 Richardson natural-gas/propane multiphase restrictions. STEP is now physically comparable through an explicit selected-liquid snapshot and reports -31.49% rate error plus a 1.06% SRK saturation-pressure deviation; measurement uncertainty is not reported. Every ambient CO2 path detects dry ice and remains unusable, while a separate non-solid choked restriction-plane sensitivity is physically comparable and quantifies substantial error against the reported uncertainty (MAPE 19.39%; only 1/6 inside uncertainty). The Richardson series supplies measured multiphase rates with explicit phase-applicability exclusion and quantifies the current composition/model error (zero of 26 comparable cases inside the 1% measurement band). Frames remain UNQUALIFIED. Independently review the STEP reconstruction and justify or reduce its adverse error over an explicit range; add solid-capable ambient calculations, reduce or justify the dense-CO2 and Richardson errors over explicit ranges, retain run-specific mixture analyses where available, and obtain accountable domain review.
Solid-formation applicability Mixture-specific solid/hydrate station assessment now fails closed and retains machine-readable diagnostics. Assessed solid-bearing release physics where supported, plus independent mixture validation.
Multicomponent flashing qualification The documented 80/20 propane/butane entropy root and nearby cases close with guarded continuation; a separate same-EOS saturation path checks the maximum. The retained 27-case Richardson natural-gas/propane series adds independent measured multiphase rates, fail-closed phase applicability and deterministic error receipts. Acoustic warnings and substantial coefficient/phase-fraction differences remain explicit. Accountable domain review, run-specific compositions and additional independently measured mixtures/geometries; the current bounded series does not confer qualification.
Colab demonstration Executed, output-retaining demonstration merged in NeqSim-Colab #176 with rendering, catalog and validation-ledger checks. No remaining implementation item; broader physical qualification remains governed by the rows above.

Do not close #3860 merely because initial PRs merged or focused CI passes. The NRC retains design intent; current guidance is in physics, contract, live sessions and uncertainty.