Skip to the content.

NRC-2899: Agentic compressor automation and native P&ID feedback

This proposal is not accepted. Keep it in a proposal-only draft pull request, separate from the tested implementation candidate. Neither draft provides merge, release, engineering or construction approval. Follow the NRC process before changing a public contract.

Context and problem

Native compressor maps, control devices, dynamic vessels, safety functions and professional DEXPI export exist, but an agent needs a reproducible bridge between the actual process graph, canonical control settings, isolated fault tests and drawings. A plausible diagram or a successfully issued command cannot establish actual actuator response, hydraulic authority or full protection.

Current-master reproductions also found anti-surge commands bypassing actuator travel, shutdown motion being overridden by normal control, and check-valve UUID paths bypassing the declared cracking threshold. These are tracked in #4899, #4900 and #4901.

Decision

The following decision is proposed:

  1. Add a reusable, explicitly scoped compressor study and public orchestration entrypoint. Use native finite suction/discharge vessels, map compressor, check valve, cooler, export and cold recycle hydraulics. Keep one fixed-step execution owner; do not add a competing general solver or scheduler.
  2. Import actual sampled instruments, control links and supported shutdown actions into the canonical P&ID. Apply supported canonical policy on an isolated pristine native copy, read it back, then declare fault overrides. Reject stale receipts, unbound targets and unsupported policy edits.
  3. Retain held FT-to-calculated-margin-to-ASC causality and actual valve motion. Retain distinct BPCS/SIS native sensor objects without claiming installed independence. Expose embedded cooler utility availability and native driver commands without inventing physical utility valves or electrical equipment.
  4. Export native DEXPI 2.0.1, source-bound drawings, registers, configuration, exact results and a runnable native graph. Keep response, conservation, map/phase applicability, sampling and project qualification as separate gates.
  5. Extend existing process, rotating-equipment, control, safety and independent P&ID review agents. Discovery exposes Java/JPype inspection; it does not add an undocumented curated MCP dynamic-execution option.

Public contracts affected

Engineering and safety boundary

The reference design, chart, capacities and thresholds are synthetic assumptions. The compressor is quasi-steady with a declared programmed speed profile; rotor inertia, mechanical surge, reverse flow and zero-throughput churning are not qualified. Single-phase capacity requires actual phase evidence. A calculated margin using native model references is not an independently installed field measurement system.

Native response PASS cannot clear energy-policy exceedances, invalid map points, negative active rundown margin, partial fault windows or missing vendor/SRS data. The candidate retains four partial model/input-limit fault cases, completed negative final-element tests and cooling-loss rundown boundary crossing. Full graph rollback is rejected by the native transaction-coverage gate; reproducible reruns use fresh native deep copies, not a failed mutable graph.

ISO 15519/10628/14617, ISA 5.1 and IEC 62424/61511 references require controlled editions and accountable applicability review. No new SIL/IPL, complete HIPPS, ETS, connected compressor relief/disposal, OEM, receiving-tool or construction qualification is granted. PCA reference-data knowledge does not establish acquired symbol geometry, graphic licensing or symbol conformance.

Compatibility and migration

Preserve existing signatures and serialized identifiers. Leave ordinary valve physical-step idempotency disabled by default for legacy loops that reuse UUIDs. Opt-in studies supply one UUID per physical interval; zero-duration algebraic evaluation must not consume physical actuator movement.

Callers that previously advanced only AntiSurgeController.runTransient must also execute the actual valve/process interval. Reading target position as if it were actual position is invalid. Retain regression evidence for this behavioral correction and obtain owner classification before release; do not silently claim that dependent integrations are unchanged. The implementation guide records the handoff and supported execution contract.

Undefined native diagnostics are exported as strict JSON null with explicit path and kind; native text/fingerprints and normalized-file hashes are distinct. Do not interpret an earlier result or schema major as the new evidence contract.

Validation and qualification evidence

The separately tested candidate has 222 focused tests passing across 28 classes, full main/test compilation and Java 8 checks on all 32 changed Java sources. Independent reviews cover original defect reproductions, held map calculations, positive-flow native Cv, consumed work, mass/component/energy ledgers, source identity, native archive reload and execution, DEXPI schema/profile, strict layout and visual inspection of every sheet.

Fourteen default fault profiles and fixed-map time-step checks preserve native PASS, FAIL and partial results. Changing only canonical ASC gain 400 to 20 reaches actual readback, changes valve motion and fails surge-margin acceptance; stale receipts are rejected. This demonstrates policy causality, not plant qualification.

Require independent human review, exact-head CI and resolution of the compatibility decision before merge. Passing automated checks cannot substitute for accountable engineering approval.

Alternatives considered

Rollback strategy

Keep the proposal and implementation separate. Before release, revert the single implementation commit if owners reject its compatibility or execution contract. Do not reinterpret new configuration/evidence files using older readers. Preserve historical failed test and study evidence; a code revert does not qualify a plant.

Decision record