Open-drain review in NeqSim combines two evidence streams:
| Evidence stream | Source | Use in review |
|---|---|---|
| Calculated process evidence | NeqSim streams, equipment, and process systems | Liquid leak rate, liquid density, pressure, temperature, firewater load, and drain hydraulic capacity |
| Normalized document and operational evidence | STID/P&ID extracts, line lists, design-basis records, and optional tagreader summaries | Drain segregation, backflow prevention, seals, vents, fire-area separation, helideck and temporary-storage evidence |
The central class for the calculated path is neqsim.process.safety.opendrain.OpenDrainProcessEvidenceCalculator. It builds OpenDrainReviewInput or OpenDrainReviewItem objects that are consumed by OpenDrainReviewEngine, so the same NORSOK S-001 Clause 9 checks can run on either calculated NeqSim evidence or externally normalized JSON.
The MCP runner run_open_drain_review accepts normalized JSON. It does not open a direct STID or tagreader connection; retrieval and historian reads should normalize evidence before calling the Java runner.
Calculated Values
OpenDrainProcessEvidenceCalculator writes these review keys into each OpenDrainReviewItem when the underlying stream contains enough thermodynamic and design-basis data:
| Key | Unit | Meaning |
|---|---|---|
neqsimLiquidMassFlowKgPerS |
kg/s | Total liquid-like phase mass flow from oil, aqueous, liquid, and liquid-asphaltene phases |
liquidLeakRateKgPerS |
kg/s | Credible liquid leak rate, calculated from liquid flow, leak fraction, and maximum credible leak cap |
liquidDensityKgPerM3 |
kg/m3 | Mass-flow-weighted liquid density, or total fluid density if no liquid phase is present |
pressureBara |
bara | Stream operating pressure |
temperatureC |
deg C | Stream operating temperature |
fireWaterCapacityKgPerS |
kg/s | Firewater mass load from application area, application rate, and water density |
drainageCapacityKgPerS |
kg/s | Gravity-drain hydraulic capacity from density, drain diameter, head, discharge coefficient, and backpressure |
The capacity check in OpenDrainReviewEngine compares:
against drainageCapacityKgPerS. The gravity-drain helper subtracts downstream backpressure as an opposing liquid head before calculating capacity.
Java Example
This example creates a liquid stream, derives open-drain evidence from NeqSim, and runs the review engine. The same API calls are covered by OpenDrainReviewEngineTest.testNeqSimStreamEvidenceDrivesOpenDrainReview.
import neqsim.process.equipment.stream.Stream;
import neqsim.process.safety.opendrain.OpenDrainProcessEvidenceCalculator;
import neqsim.process.safety.opendrain.OpenDrainReviewEngine;
import neqsim.process.safety.opendrain.OpenDrainReviewInput;
import neqsim.process.safety.opendrain.OpenDrainReviewItem;
import neqsim.process.safety.opendrain.OpenDrainReviewReport;
import neqsim.thermo.system.SystemInterface;
import neqsim.thermo.system.SystemSrkEos;
SystemInterface fluid = new SystemSrkEos(293.15, 8.0);
fluid.addComponent("n-heptane", 1.0);
fluid.setMixingRule("classic");
Stream liquidStream = new Stream("OD process liquid", fluid);
liquidStream.setFlowRate(8.0, "kg/sec");
liquidStream.run();
OpenDrainProcessEvidenceCalculator.DesignBasis basis =
new OpenDrainProcessEvidenceCalculator.DesignBasis()
.setAreaId("OD-NEQSIM-01")
.setSourceReference("NeqSim process model: OD process liquid")
.setFireWaterAreaM2(20.0)
.setFireWaterApplicationRateLPerMinM2(18.0)
.setDrainPipeDiameterM(0.20)
.setAvailableDrainHeadM(1.0)
.setCredibleLeakFractionOfLiquidFlow(1.0)
.setMaximumCredibleLiquidLeakRateKgPerS(5.0);
OpenDrainReviewInput input = OpenDrainProcessEvidenceCalculator.createInputFromStream(
"NeqSim calculated open drain review", liquidStream, basis);
OpenDrainReviewItem item = input.getItems().get(0);
double leakRateKgPerS = item.getDouble(Double.NaN, "liquidLeakRateKgPerS");
double drainCapacityKgPerS = item.getDouble(Double.NaN, "drainageCapacityKgPerS");
OpenDrainReviewReport report = new OpenDrainReviewEngine().evaluate(input);
String verdict = report.getOverallVerdict();
Process-System Workflow
Use createInputFromProcessSystem(process, basis) when a complete flowsheet is available. The helper walks process units, selects representative inlet or outlet streams, and creates one review item per stream-bearing unit.
For multi-area plants, create area-specific design bases where firewater area, drain diameter, available head, and safeguard evidence differ. The generic process-system helper is a screening shortcut, not a substitute for area-by-area STID and line-list evidence.
Normalized JSON Evidence
The review engine also accepts normalized items, openDrainAreas, drainAreas, or stidData. Use this when STID/P&ID extraction or tagreader summaries have already provided evidence values.
{
"projectName": "Open drain review",
"openDrainAreas": [
{
"areaId": "OD-A01",
"areaType": "process area",
"drainSystemType": "hazardous open drain",
"standards": "NORSOK S-001; NORSOK P-002; ISO 13702",
"sourceHasFlammableOrHazardousLiquid": true,
"liquidLeakRateKgPerS": 5.0,
"fireWaterCapacityKgPerS": 6.0,
"drainageCapacityKgPerS": 12.0,
"hasOpenDrainMeasures": true,
"backflowPrevented": true,
"closedOpenDrainInteractionPrevented": true,
"hazardousNonHazardousPhysicallySeparated": true,
"sealDesignedForMaxBackpressure": true,
"ventTerminatedSafe": true,
"openDrainDependsOnUtility": false
}
]
}
Safeguards That Still Need Evidence
NeqSim can calculate process and hydraulic evidence, but it cannot infer all layout and design-basis requirements from a stream. Keep these values traceable to STID/P&ID, design basis, line list, area safety chart, or tagreader records:
| Evidence key | Typical source |
|---|---|
hasOpenDrainMeasures |
STID/P&ID drain boxes, gutters, coamings, deck drainage |
backflowPrevented |
Drain hydraulics, non-return devices, elevation breaks, sump/caisson checks |
closedOpenDrainInteractionPrevented |
Drain philosophy, P&ID separation, seal design |
hazardousNonHazardousPhysicallySeparated |
Drain routing drawings and common-sump safeguards |
sealDesignedForMaxBackpressure |
Seal height and hydraulic grade-line calculation |
ventTerminatedSafe |
Vent routing drawings and hazardous-area review |
openDrainDependsOnUtility |
Utility-loss assessment and pump/sump design |
Verification
The documented NeqSim stream workflow is exercised in OpenDrainReviewEngineTest. Focused verification command:
.\mvnw.cmd test "-Dtest=OpenDrainReviewEngineTest"
Use targeted Checkstyle when changing the package:
.\mvnw.cmd checkstyle:check "-Dcheckstyle.includes=**/opendrain/*.java,**/OpenDrainReviewEngineTest.java"