DEXPI physics-bridge evaluation
Goal: NeqSim should be the strongest tool for connecting physics simulation to DEXPI. It should turn a simulation into a professional P&ID, and turn a P&ID into a runnable model for physics studies.
This page records an independent, executed evaluation of current master (21 November 2026) against that goal. It complements the current-master audit, which is a source inventory. Here every claim comes from running the code on a realistic case and, where possible, checking the output with an independent consumer (pyDEXPI 2.1.0).
Evaluation case
The evaluation used an HP/LP separation train with recompression: a 50 t/h well fluid feed (SRK,
12 components), an inlet heater, an HP separator, and a gas cooler and scrubber. It also has an
export compressor (120 bara) and two liquid letdown valves into a mixer and the LP separator, an
oil pump, and LP gas recompression recycled to the HP gas line through a Recycle. In total there
are 17 units with one material recycle. A three-phase separator with a three-way splitter, and the
official DEXPI example C01V04-VER.EX01.xml from a third-party tool, were used as extra cases.
Scorecard
| Capability | Result | Evidence |
|---|---|---|
| Simulation to Proteus P&ID XML | Good | 17 units, 16 lines, operating P/T/flow on 31 items, design data, recycle closure kept; 0.2–0.4 s |
| Simulation to native DEXPI 2.0.1 Plant | Good | Schema/profile conformant; pyDEXPI strict load with 0 errors |
| Simulation to native DEXPI 2.0.1 Process | Good | Conformant and pyDEXPI-clean, including models with a single-stream Recycle (closed by stream identity) |
| Simulation to native DEXPI 2.0.0 Process | Good | Mandatory Method and DisplayText now written; pyDEXPI loads all steps with 0 issues; still no EngineeringModel provenance (no metadata in this API) |
| Simulation to native DEXPI 2.0.0 Plant | Partial | Heater exported as FiredHeater, which pyDEXPI rejects; GlobeValve attributes not in the model |
| Stream state in Process exchange | Partial | 19 streams with P, T and mass flow; no composition, so the file alone cannot be re-simulated |
Quick Proteus drawing (DexpiXmlSvgRenderer) |
Not professional | One 1.8 m-wide row; lines cross equipment; Recycle solver helper drawn as equipment |
Native document-set P&ID view (EngineeringDiagramDelivery, PID profile) |
Not professional | Labelled boxes in tag order on a grid, no ISO 10628 symbols, heavy line crossings; manifest still reports completeWithinDeclaredScope: true. Use the professional package below for P&IDs |
Professional P&ID (ProfessionalPidPackageExporter) |
Was partial; improved | See the drawing-standards results below |
| NeqSim Proteus P&ID to runnable simulation | Was broken; fixed | Before: 3 of 17 units missing, liquid routed as gas, 50 t/h duplicated feed, setpoints lost, run failed. After: identical results (see below) |
| Third-party P&ID to simulation | Improved | Before: disconnected units and a pump crash with no reason. After: connected flowsheet, recycle closed, isolation/check/safety valves handled, 4 missing specifications reported by tag |
| Native DEXPI 2.x to simulation | Gap | Not supported. Before: silently built a feed-only model. After: explicit error naming the supported route |
| Instrument and control-loop intake | Partial | C01 example: 4 instruments, 4 loops, 3 actuating functions read as metadata; not bound to NeqSim controllers on the actual valves |
Round-trip fidelity after the fix
The 17-unit recycle train was exported with DexpiXmlWriter.write(...), rebuilt with
DexpiSimulationBuilder, and run with the same fluid and feed:
| Result | Source model | Rebuilt from DEXPI |
|---|---|---|
| HP separator gas / liquid | 28 014 / 21 986 kg/h | 28 014 / 21 986 kg/h |
| LP separator gas / liquid | 2 668 / 21 935 kg/h | 2 667 / 21 934 kg/h |
| Export compressor power | 612.5 kW | 612.5 kW |
| Recompressor power | 145.0 kW | 144.9 kW |
| Oil pump power | 21.8 kW | 21.8 kW |
| Inlet heater duty | 205.6 kW | 205.6 kW |
The three-phase case also reproduced the 50/30/20 split from the exported branch flows, the water routing, and the pump power. A legacy file with the new port attributes removed rebuilt identically through the fallback rules.
Root causes found and fixed
- In-line valves broke every path through them. NeqSim writes a valve as a
PipingComponentinside its line segment, and connections point at the valve’s own nozzles. The resolver mapped only equipment nozzles, so those connections were dropped and the valve disappeared.DexpiFlowsheetGraphnow keeps valves with an operating outlet pressure as flowsheet units. - Only the gas outlet was ever wired. The builder took
getGasOutletStream(...)for every upstream unit, so separator liquid went to pumps as gas. Outlets are now resolved per connection (see below). - Mixers kept one inlet. Disconnected units got a duplicate of the full feed, which doubled mass. All incoming connections are now wired, and duplicate feeds are reported.
- Setpoints were discarded. Exported operating outlet P and T were ignored; heaters defaulted to 100 °C and compressors to their inlet pressure, which gave negative power. They are now applied with unit conversion.
- Loops were not closed. Loops are now torn and closed with a
Recycle. - Splitters exported only their first branch.
DexpiXmlWriternow writes one nozzle per branch, and the builder recovers split factors from branch flows. - Nozzle phase was not exchanged.
DexpiXmlWriternow writes aNeqSimPortAttributesgeneric-attribute set (PortRole,PortIndex) on every nozzle. Other tools can ignore it. For files without it, the builder falls back to the downstream unit type, then the nozzle height, then document order.
Regression coverage: DexpiSimulationRoundTripTest (5 tests, all of which fail on the previous
builder). All 402 existing DEXPI/diagram tests and the engineering/P&ID tests still pass when run with
the JVM module opens configured in the POM.
Professional P&ID drawing standards
The professional P&ID was rendered for the same 17-unit train and checked against ISO 10628-1/-2, ISO 5457, ISO 7200 and ANSI/ISA-5.1 drawing practice. The same automated rules were applied to the output before and after the change:
| Finding on the 17-unit train | Before | After |
|---|---|---|
| Signal continuation flags pointing to their own sheet | 77 | 0 (direct dashed signal lines) |
Internal simulation names as line labels (gasOutStream, BL outStream) |
25 | 0 (NORSOK-style line numbers with register) |
| Automated valves drawn without an actuator | 12 | 0 |
| Sheets without ISO 5457 grid and centring marks, or missing ISO 7200 fields | 14 of 14 | 0 |
Drawing coverage errors (mixers and the Recycle helper) |
6 | 0 |
| PSVs, BDVs, vents and drains drawn (with opt-in standard connections) | 0 (HOLD register) | drawn on pooled auxiliary sheets |
| Level control valve in series with the modelled letdown valve | 1 per separator | 0 (modelled valve is the final element) |
| Sheets for the 17-unit train | 14 (relief devices not drawn) | 15 (relief devices drawn; auxiliary sheets pooled; heaters and coolers share a sheet) |
The full convention table and the check codes are in Drawing conventions applied to every sheet. These are automated checks of implemented conventions, not an ISO certification: the symbol catalogue is NeqSim-authored, and controlled standards and discipline review remain required.
Simple heaters and coolers now share “Heat exchangers” sheets (up to three bands per A1
sheet), while separators and compressors keep their own sheet. On the 17-unit train this cuts the
set from 17 to 15 sheets. A new PID_STANDARD_DRAWING_AREA check keeps every symbol inside the
ISO 5457 frame; it caught header-tee continuation flags that started in the filing margin, which
are now moved inside.
Also resolved: PSVs use the ISO 10628-2 angle-pattern body, nozzles are labelled N1, N2 with a nozzle register, manual valves show their normal position instead of a fail action, and plain mixers no longer receive nozzle proposals.
Physics studies on the generated P&ID
PidSafetyStudies now runs relief, blowdown, flare-load, trip set point and SIL screening studies
on the proposed safeguards and writes the results back to the P&ID, the drawings, DEXPI 2.0.1 and
the HAZOP preparation (details). On the 17-unit train it
takes about 10 s and updates 29 elements:
| Result | Value |
|---|---|
| HP separator PSV | set 64.9 barg, blocked outlet governs (27 400 kg/h), orifice J |
| LP separator PSV | set 12.5 barg, gas blow-by through 20-LV-001 governs (4 170 kg/h, versus 2 090 kg/h blocked outlet and 3 110 kg/h fire), orifice H |
| Separator blowdown | 8, 9 and 4 mm orifices reach the API 521 target in 805 to 890 s |
| Compressor blowdown (2 m3 declared) | 7 mm; fluid falls to -58 C, flagged for the material check |
| Flare load | 28 000 kg/h, set by the largest single relief case, not by simultaneous blowdown (4 300 kg/h) |
| Pressure and level trips | SIL 2 (NOG 070) met at PFDavg 7.9e-3 with partial-stroke testing on the inlet ESD valve |
| HAZOP | 32 deviations quote calculated safeguard evidence; the two mixer-node errors are gone |
Open items are reported as findings, for example the HP liquid being supercritical at fire relieving pressure, compressor segment volumes, low-low level trips with no final element, and the letdown valve Cv taken from the model.
Remaining drawing gaps:
- Utility-side control valves and meters (cooler TCVs) stay HOLD until the utility system is supplied.
Roadmap to the goal
Ordered by how much each item blocks the goal.
| Priority | Item | Why it matters |
|---|---|---|
| Done | Recycle projection in the 2.0.1 Process writer; mandatory Method and DisplayText in the 2.0.0 Process path |
Verified with neqsim dexpi-check: NeqSim CONFORMANT and pyDEXPI 0 issues on the 17-unit recycle train |
| P2 | Bundle the 2.0.0 model files and run the model-level multiplicity validator on the 2.0.0 path | The NeqSim assessment still cannot see 2.0.0 multiplicity defects; pyDEXPI (neqsim dexpi-check) is the independent guard |
| P1 | Native DEXPI 2.0.1 Plant and Process import into ProcessSystem, reusing the flowsheet graph and diagnostics |
Modern CAE tools exchange 2.0.1; pyDEXPI already reads NeqSim’s 2.0.1 output, but NeqSim does not |
| P1 | Export the fluid definition (composition, EoS reference) with Process streams | Lets a DEXPI file alone carry enough to re-run the physics |
| P3 | Professional P&ID: utility-system input for cooler control valves | ISO frame, title block, ISA symbols, direct signals, line numbers, relief connections, nozzle labels, pooled auxiliary sheets and shared heat-exchanger sheets are done |
| P2 | Make delivery manifests fail-closed on visual quality: no completeWithinDeclaredScope: true for an unrouted box diagram |
Prevents overstated claims in engineering packages |
| P2 | Bind DEXPI control loops to NeqSim controllers on the named final element (for example PICSA 4712.02 to PV4712.02) |
Turns the P&ID into a dynamic model rather than category-renamed auto-instrumentation |
| P2 | Consistent heater mapping across profiles (heat exchanger unless fired) | FiredHeater and HeatingInFurnace misdescribe topsides heaters |
| P2 | Flare network hydraulics and radiation from the study loads; two-phase relief; ESD valve closure-time verification | PidSafetyStudies delivers loads, orifices and set points; the disposal system itself is not yet calculated |
| P3 | Named-tool round-trip qualification (for example AVEVA, Hexagon, COMOS) with recorded evidence | Required before any interoperability claim |
Reproduce
The scorecard numbers come from small Java drivers that build the evaluation case, export through
DexpiXmlWriter, Dexpi20XmlWriter, Dexpi201XmlWriter, Dexpi20ProcessModelWriter,
Dexpi201ProcessModelWriter and EngineeringDiagramDelivery, and rebuild with
DexpiSimulationBuilder. Independent checks used
pydexpi.loaders.public.load_xml_with_report(..., strict=True) from pyDEXPI 2.1.0.
DexpiSimulationRoundTripTest contains the executable form of the round-trip results.