Skip to the content.

For the relationship between P&ID proposal synthesis, native DEXPI 2.0 Plant exchange, Proteus/pyDEXPI compatibility, validation, and named-tool qualification, see the DEXPI Engineering Guide.

NeqSim can generate a reviewable P&ID proposal from the same engineering project that owns the process simulation, requirements, relief studies and DEXPI export. The generator deliberately does not claim that an automatically produced drawing is approved or fit for construction.

Professional P&ID and simulation handoff

Start with the runnable ProcessSystem and its controlled EngineeringProject. Prepare the P&ID through PidDesignSynthesizer and the applicable rule catalog. Create PidSimulationBindings.from(project, pid), bind the actual equipment, measurement and controller objects, and check the current project/P&ID identities before passing the model and bindings to ProfessionalPidPackageExporter. The professional path selects native DEXPI 2.0.1 explicitly and retains the design model, engineering registers, drawing and projection findings, and simulation binding evidence. Existing PidEngineeringPackageExporter.export(...) remains the compatibility package path.

The five-argument professional export accepts the project, P&ID model, PidSimulationBindings, controlled Dexpi20PlantExportMetadata, and a new output directory. Its longer overload also accepts the drawing number, evidence-bearing symbol conventions and persistent layout register. Converge the source process before export and inspect these outputs:

Output Purpose
plant.dexpi.xml, dexpi-2.0.1-conformance.json Exact native 2.0.1 exchange and its assessment
drawings/pid-drawing-set.pdf, drawings/pid-sheet-NNN.svg Native A1 review drawings and per-sheet vector views; explicit legacy layouts retain their selected representation
drawings/pfd-overview.pdf, drawings/pfd-overview.svg Native A1 process overview for one to four primary units, with actual streams, valves and normal operating data
engineering-graph.json, pid-document-set.json Controlled semantic and document identities
pid-engineering-registers.json Detailed proposals, connections and missing engineering input
simulation-model.neqsim, pid-simulation-bindings.json Saved executable process and explicit P&ID tag handoff
dynamic-capability-report.json Base-model dynamic capability/activation audit
professional-pid-readiness.json Drawing, exchange, projection and review findings

Show equipment and line sizes on a professional P&ID

Before exporting a converged case, call project.setPidSizingSchedule("40") to use Schedule 40 for preliminary sizing. The professional A1 sheets place the designation beside each material line and the tagged equipment dimensions in a dedicated equipment data box. The vector PDF and SVG use the same drawing commands. The package includes pid-sizing.json for comparing the drawing with the native DEXPI quantities.

The 20,000 kg/h inlet-separation regression produces a 1,098 mm shell ID and a 5,491 mm tangent length. Its gas and liquid branches screen at NPS 3½ and NPS 1½ respectively. The inlet carries its supplied DN 80 designation. Open the vector drawing to inspect the instrument taps, size labels on both sides of the pressure valve, and equipment data box.

Sized inlet-separator P&ID

Equipment or line Drawing callout DEXPI 2.0.1 representation
Separator Shell inside diameter and tangent-to-tangent length in mm Owned Chamber.InsideDiameter and Chamber.Length
Two-stream exchanger Design heat-transfer area including the configured area margin DesignHeatTransferArea in square metres
Pump Rated flow and head DesignVolumeFlowRate and DesignPressureHead
Centrifugal compressor Inlet impeller diameter when the mechanical feasibility checks pass Owned Impeller.Diameter
Process line Stream tag, DN or NPS designation, piping class when supplied PipingNetworkSegment.NominalDiameterRepresentation, nominal type/value and PipingClassCode

LineDesignInput values take priority. A per-line schedule overrides the project schedule. The overload accepting a configured NorsokP002LineSizingValidator uses the project velocity and erosion limits. The velocity screen uses the summed actual phase volume flow and mixture density. It selects the smallest tabulated inside bore satisfying the service velocity ceiling and erosional limit, then reports its nominal size. Calculated line designations carry PREL. on the drawing and OnHold in DEXPI. Supply the nominal size for relief lines from the applicable relief case. Missing piping classes and unavailable dimensions carry a HOLD. Review the design flow envelope, pressure loss, minimum velocity, mechanical wall, vibration and project piping class before accepting a proposed size.

Mechanical calculations run on detached design objects, preserving the source process geometry. Each export uses the current solved case. Omitting the schedule retains controlled-only line sizing. Explicitly pinned legacy drawing layouts retain their existing annotation profile.

The saved process can be loaded with ProcessSystem.loadFromNeqsim(...); check for a failed load and preserve the matching model, project and binding definition when resuming studies. The saved process does not implement an unbound proposed control or safeguard.

Select the exchange edition in the project basis using NorsokOffshoreEngineeringBuilder.from(name, process, "2.0.1"). ProfessionalPidPackageExporter rejects a conflicting or missing DEXPI edition before writing files. Existing two-argument builder calls retain their legacy 2.0 basis and compatibility behavior. On reopening, recreate the same project ID, revision and edition, restore PidDesignModel.fromJson(...), and restore PidSimulationBindings.fromJson(project, pid, bindingJson) before simulation. ProfessionalPidPackageReader.read(...) performs that controlled reopening from the package, including complete manifest integrity, native DEXPI 2.0.1 relationship checks and supported-import diagnostics. Use readStrict(...) when any diagnostic must fail closed. Re-export to a new directory and compare the two verified reads with ProfessionalPidPackageReader.compare(...); equivalence covers the canonical model, bindings and supported native semantics, while unsupported content remains an explicit non-equivalent result.

generationStatus=INCOMPLETE_NATIVE_PROPOSAL_PROJECTION means proposal tags are missing from the native exchange. Close those mappings before treating the native file as a full P&ID handover. Tag presence alone does not establish correct physical connections: nativeProposalConnectivityQualification remains REQUIRED and fullPidSemanticEquivalence remains NOT_QUALIFIED. Inspect those findings and each drawing rather than treating file generation as completion.

Create PidSimulationBindings from the project and P&ID model. Explicitly bind the P&ID valve, instrument and controller tags to the corresponding live NeqSim objects. The bindings resolve the same identities on isolated process copies; they do not replace those objects with separate drawing-only simulation models. Use PidSimulationSession to initialize and run steady state and to execute scoped DynamicSafetyScenario tests after strict configured-copy preflight. Persist returned scoped session results as controlled evidence; the session does not automatically record them on the project. Project-configured studies can be executed through EngineeringSimulationRunner; the exporter includes engineering-simulation-results.json when that project result exists. Regenerate the package in a new directory with the linked evidence. Rebuild stale bindings before export if the source topology, P&ID or revision changed.

Retain source revision, binding scope, missing runtime objects, scenario criteria, capability findings and results. A change to the P&ID/model or its controlled revision requires reassessing the bindings and affected tests. Drawing topology alone does not specify fluid composition, thermodynamics, inventories, geometry, actuator response, controller tuning or shutdown logic. Unimplemented proposed objects remain visible gaps and cannot be credited as executed safeguards.

For multi-area ProcessModel work, retain area identities and prepare governed area projects through the existing multi-area builder. A single-area simulation binding does not establish a globally coupled multi-area dynamic solver.

Coupled separator control acceptance

PidSeparatorControlStudy executes a bounded pressure/level-control acceptance case against the actual six bound identities: PT/PIC/PCV and LT/LIC/LCV. The caller supplies the inlet-ramp definition, physical timestep, both valve candidates in US-Cv, and every response and numerical limit. The runner copies the governed process, rejects stale revisions or incomplete live wiring, enables conservative separator energy integration and tracking, and records one sample for every accepted physical step with a deterministic step ID.

The result contains pressure and level extrema, controller IAE/peak error/output travel/settling time, valve travel, component-inventory residual, separator volume residual, cumulative-energy residual, an independent energy oracle, and ordered pass/fail checks. compareRefinement(...) compares a declared coarse case with a smaller-timestep execution. evidence(...) returns revision-bound report content with explicit non-credit statements for SIL/IPL/SRS, hazard completeness and construction approval.

The public synthetic regression ramps a two-phase separator feed from 20 to 28 kg/s over 10 s and continues to 40 s. With both candidate valves at US-Cv 80 and a 1 s physical step, it observed 55.000–59.409 bara, level 0.473450–0.500061, pressure IAE 113.194 bar s, level IAE 0.436951 fraction s, and 45.0% / 2.3653% PCV / LCV output travel. Maximum component, relative volume, and relative cumulative-energy residuals were respectively 1.46e-11 mol, 5.34e-7 and 9.05e-8; the independent tracker/oracle energy difference was 0 J. Halving the step changed final pressure by 0.0444 bar, final level by 4.89e-4 and final LCV opening by 0.0925 percentage point. Under the same independently declared 60.0 bara acceptance limit, US-Cv 80 passed while US-Cv 20 retained an observed 67.498 bara failure. These numbers qualify only this synthetic fluid, geometry, controller settings, ramp and numerical policy; they are not valve sizing, vendor-performance or facility safety approval.

Use @engineering-deliverables and neqsim-pid-process-operations for requests such as:

Require an assessed native exchange, reviewable vector drawings, coherent registers, explicit missing design inputs, and the scoped simulation results. Keep visual acceptance, receiving-tool qualification, standards review and accountable engineering approval as separate checks. Generated files alone do not establish that every proposed component is physically connected, drawn, simulated or approved.

Actual native safety functions, automatic proposals and executed feedback

When an executable candidate already exists, PidSafetyFunctionImporter.fromNativeFunction(...) proposes its actual measurement channels, voting function, final elements and native settings in a copied PidDesignModel. It reuses exact existing bindings, preserves canonical IDs and leaves the input model unchanged. Rebuild PidSimulationBindings after each import or governed proposal change. The importer does not derive a hazard assessment, choose a trip threshold or assign SIL: those remain explicit engineering-policy inputs.

SafetyFunctionChannel.highTripFromMeasurement(...) and its low-trip counterpart derive the channel tag from the actual measurement and read its enabled held physical-step sample. Capturing a source from another process copy fails. manualTripFromPushButton(...) reads the actual local binary button and rejects hidden linked automatic actions. Legacy arbitrary extractors remain available but do not establish verified measurement identity. The native channel latches a qualified demand until reset; fixed configured voting is not a simultaneous raw-signal coincidence test. Distinct simulated channel objects do not prove independent installed taps, power, logic or common-cause resistance.

The bounded configured-copy workflow is:

  1. Import the actual healthy native candidate, then bind its instruments, controllers and physical valves through their exact canonical identities.
  2. Read governed proposal attributes into the scenario factory. Use PidSafetyFunctionValidator.validateConfigured(...) to compare actual source references, units, thresholds, qualification/logic delays, voting, actuator stroke/fail position and ordered command policy with the canonical graph. The supported isolation policy is native fail-closed ESD valves commanded by exact native trip actions, optionally grouped in parallel. Opening commands, opaque actions, missing targets and incompatible graph/settings fail closed.
  3. Retain the returned ConfiguredFunction fingerprint and evidence reference in the scenario definition. Repeat validation on the actual configured copy inside its factory and use assertSameConfiguration(...) before execution. Enable event-exact timing for held-sample scenarios. Preserve the physical source fingerprint separately from the configured topology and numerical execution order; numerical pressure-coupling helpers are not drawn hardware.
  4. Run scoped studies through PidSimulationSession, or declared project scenarios through EngineeringSimulationRunner.runStrict(...). The latter executes strict configured-copy preflight and retains the actual native results on that project; it does not adopt a caller-supplied result list.
  5. Attach results with PidSafetyFunctionValidator.attachResult(...), declaring required full-window MAINTAIN_BOUNDS criteria. Preserve the resulting canonical IDs, configuration/scenario/result hashes and actual native readback beside the DEXPI package. Regenerate into a new directory and run the deterministic and independent drawing/standards reviews.

MAINTAIN_BOUNDS checks every sampled value over its declared post-event window and requires both window endpoints. Default REACH_BY_DEADLINE instead measures first attainment; an initially satisfied sample cannot establish an invariant. Neither mode proves continuous-time behavior between samples. Feedback retains NOT_EXECUTED, INCOMPLETE, OBSERVED_FAIL, MONITORED_NO_DEMAND, DEMAND_WITHOUT_ACTUATION, ACTUATED_RESPONSE_INCOMPLETE and DEMAND_RESPONSE_OBSERVED separately. Deadline credit covers only explicitly declared criteria. Expected-fault assertions never relabel an observed process FAIL as PASS. Keep component and cumulative-energy assessments separate; a response PASS cannot clear a numerical energy HOLD/FAIL.

The public AdvancedSafetyPidExample and AdvancedV101SafetyStudy test fixtures exercise this path on two actual separator inventories, an upstream ESD valve, a separate interstage finite-stroke HIPPS candidate, three actual pressure channels, three BPCS loops and a local manual trip. The native export includes four P&ID sheets and a PFD for that example. Shared manual/automatic final-element targets receive no inferred independent-barrier credit. Manual trip does not imply a turbine or compressor ETS model.

The same function/instrument/actuator IDs map to native DEXPI 2.0.1 objects and signal links. Governed executable settings, evidence and implementation remain a coordinated package: XML alone does not configure a PLC, reconstruct scenario code or qualify a named receiving-tool round trip. Controlled standards review, relief/safety lifecycle evidence and accountable approval remain HOLD.

Native ISO-basis drawing and connectivity checks

After generation, apply the separate P&ID quality and standards review. neqsim pid-review rechecks actual artifacts and integrates content-bound visual and controlled standards receipts. Native/geometry success alone cannot produce a completed standards review. The generating owner fixes defects and regenerates; the independent reviewer retains findings and engineering HOLDs.

For a professional package, the explicit canonical PidDesignModel is the sole native instrumentation proposal authority. The exporter disables generic requirement-to-PCE/safeguard/nozzle synthesis before applying that model; all requirements remain in the engineering manifest and review registers. The engineering-projection sidecar records the policy and retained requirement IDs. Engineering-only native export keeps its default generic typed proposals, but an ENGINEERING_ASSESSMENT never invents a process instrument or sensing nozzle. Callers applying their own canonical overlay can select the explicit exportDexpi201(..., includeRequirementProposals) overload accordingly.

Auxiliary material lines use the same line identity in the physical projection, native XML, drawing routes and engineering registers. Project line-design inputs retain their values/evidence as REVIEW_REQUIRED, including actual product boundaries; series auxiliary devices share one line row. Absent auxiliary data remain HOLD. Vessel sensing strokes meet the actual dished hull, rather than its bounding rectangle. Equipment/stream-owned tee anchors are on the equipment side of synthesized inline devices. Inline projection precedes auxiliary tees so proposal iteration order cannot move a recycle across isolation or check valves. Use an explicit supported source-port owner for other locations; do not infer an arbitrary point along a stream that contains several devices.

The professional exporter now uses ProfessionalPidDiagramRenderer and ProfessionalPidSymbolLibrary for default native A1 landscape scenes. It preserves the actual separator orientation, uses distinct control, isolation, check and relief-valve families, adds pneumatic actuator decoration only for an explicitly supplied actuatorType=PNEUMATIC_DIAPHRAGM_PROPOSAL, separates field measurement from shared control/safety functions, and retains named signal continuations. Existing explicitly controlled manual layouts retain their previous representation and are labelled separately in readiness; they are never silently replaced by the automatic professional layout.

Locally represented two- or three-input functions have distinct signal anchors and a single shared voting symbol. An actual bound manual push button is a field function without a fabricated process sensing tap in either the drawing or native DEXPI. Actual valve-port monitors and eligible unconnected overflow monitors use reciprocal instrumentation-detail sheets with the existing stream, port and primary-sheet identities. Detail views repeat a labelled existing segment; they do not create additional valves or piping. A bound inter-unit valve is shown on its declared receiving-equipment sheet rather than as two physical valves on adjacent sheets. Unsupported locations still remain HOLD.

The drawing basis is ISO 10628-1:2014 for diagram content/drafting, ISO 10628-2:2012 and ISO 14617 for process symbols, ISO 5457/7200 for paper/document fields, and IEC 62424 with ANSI/ISA-5.1 for PCE notation. The new authored vector catalogue is not an independently qualified ISO symbol catalogue. The exporter records standards review, design-input and discipline HOLDs instead of claiming certification or assigning an approver.

Drawing conventions applied to every sheet

The professional renderer applies the following conventions and checks them on every generated sheet. A violation is a drawing error in professional-pid-readiness.json (drawingHasNoErrors=false), so a package cannot report a clean drawing while breaking them.

Area Convention Check code
Sheet frame (ISO 5457) A1 with 20 mm filing margin and 10 mm border, 16 numbered columns and 12 lettered rows (I and O omitted), 0.7 mm centring marks PID_STANDARD_SHEET_FRAME
Title block (ISO 7200) 180 mm identification block: owner, document type, title, document number, project, revision, SHEET n OF N, language, issue date, status, creator, approver; revision table (REV, DATE, DESCRIPTION, PREP, CHK, APPR) and drawing notes PID_STANDARD_TITLE_BLOCK, PID_STANDARD_SHEET_NUMBERING
Valves (ISO 10628-2, ISA-5.1) Control valves and automated on/off valves always show the ISA-5.1 generic actuator; shutdown and blowdown valves add a ball closure element; manual isolation valves have no actuator. The ISA function letters of the tag govern the symbol, so a PCV or ASV modelled with shutdown-valve dynamics is still drawn as a control valve, and an XV/SDV/ESDV is always actuated PID_STANDARD_VALVE_SYMBOL
Instrument functions (ISA-5.1) Field instrument: circle. Shared display/control (PCS/DCS): circle in square with line. SIS/ESD/PSD logic: diamond in square with line symbolConventions in the content report
Signals (IEC 62424, ISA-5.1) A signal whose two ends are on the same sheet is drawn directly as a dashed line, routed clear of symbols and text and interrupted where it crosses another line. Several signals to one final element join at a junction dot. A named continuation is used only across sheets, or when no clear route exists (warning) PID_STANDARD_SIGNAL_SELF_REFERENCE (warning)
Sheet references Continuation flags give the sheet where the peer is actually drawn; a peer that is not drawn on any sheet reads /HOLD PID_STANDARD_UNRESOLVED_REFERENCE
Line designations Streams with internal simulation names get NORSOK-style numbers <area>-<fluid code>-<sequence> (PG vapour, PL liquid). Names that are already line tags are kept. lineNumberRegister in the content report maps every number to its source stream; generated numbers are LINE_NUMBER_GENERATED holds for line-list confirmation PID_STANDARD_LINE_DESIGNATION
Text Minimum height 2.5 mm PID_STANDARD_TEXT_HEIGHT
Equipment data A callout above each primary unit gives tag, service, operating pressure, temperature and duty or power from the converged model, and design conditions (HOLD until supplied) —
Flowsheet fidelity Two- or three-inlet header mixers are drawn as tees on the receiving unit’s sheet and get no equipment nozzles. Solver utilities (Recycle, Calculator, Adjuster) are not drawn; recycle lines connect their real physical ends DRAWING_SOURCE_EQUIPMENT_UNREPRESENTED
Nozzles Labelled N1, N2, … per equipment, continuing onto the auxiliary sheets; nozzleRegister in the content report maps each label to its controlled nozzle identity —
Relief valves (ISO 10628-2) Spring-loaded angle-pattern body: inlet from below, outlet to the side, tag beside the valve —
Manual valves Show their normal position (NC for drains and vents, otherwise NO/NC:HOLD); fail action (FA) applies to actuated valves only —
Sheet grouping Separators, compressors, pumps, columns and other major units get one sheet each. Simple heaters and coolers (one inlet, one outlet, at most five instrument rows, no instrument-detail sheet, fed directly or through a two-inlet header) are drawn as horizontal bands on shared “Heat exchangers” sheets, up to three per A1 sheet in flowsheet order. Relief, blowdown, vent, drain and utility connections of all units share pooled auxiliary sheets, four routes per sheet —
Drawing area (ISO 5457) Every symbol, including continuation flags, lies inside the drawing frame PID_STANDARD_DRAWING_AREA
Existing devices When a separator liquid outlet already feeds a modelled throttling valve, the level loop uses that valve (its own tag) as the final element instead of proposing a second valve in series —

Relief valves, blowdown valves, vents and drains need explicit auxiliary routes, and stay in the HOLD register until they have them. For a review drawing that shows them in the usual arrangement, call PidStandardConnectionProposals.complete(model, project.getEngineeringProcessSystem()) before creating the bindings. It gives each one a dedicated equipment nozzle and routes it to FLARE-HEADER (or the model’s flare off-page connector) or to CLOSED-DRAIN-HEADER. Each completed element records a designEvidenceReference starting with NEQSIM-STANDARD-CONNECTION-PROPOSAL and stays review-required. Explicit project inputs are never overwritten, and utility-side proposals are left for project data.

PidDesignModel pid = PidDesignSynthesizer.synthesize(project,
    new PidDesignBasis("NORSOK-COMPLETE-PID-PROPOSALS", "20"),
    NorsokPidRuleCatalog.completeProposals());
PidStandardConnectionProposals.complete(pid, project.getEngineeringProcessSystem());
PidSimulationBindings bindings = PidSimulationBindings.from(project, pid);
Path exported = ProfessionalPidPackageExporter.export(project, pid, bindings, metadata, outputDirectory);

These conventions are implemented and checked automatically. They do not replace the controlled standards review: the symbol catalogue is still authored by NeqSim, not an independently qualified ISO library. ProfessionalPidDrawingStandardsTest pins the conventions.

Inspect these additional artifacts:

Artifact What it proves
pid-physical-projection.json Shared, source-backed equipment/line/nozzle attachments and directed functional links used by both drawing and native exchange
pid-drawing-content-report.json Actual rendered sheet index, symbol/content coverage, line-design and valve-data gaps, controlled issue date and explicit ISO-review status
drawings/pid-sheet-NNN.layout.json Source geometry for the mandatory deterministic layout check, separate from standards/content review
plant.dexpi.xml.pid-projection.json Native IDs, connected proposal projection, real signal/actuator endpoints, unresolved elements and assessment of the final exact XML bytes

A valid DEXPI file does not establish a complete P&ID. A geometrically valid sheet does not establish ISO content/symbol conformance. Require all source and proposal identities, physical/signal endpoints, sizing/class information and controlled review evidence before claiming the relevant qualification. Source-area document identities remain in pid-document-set.json; the derived representation sheet index is in pid-drawing-content-report.json and shares the same source-graph fingerprint. Neither sheet pagination nor an extra representation changes the physical simulation model.

Supply controlled LineDesignInput rows keyed by the actual stream/line tag. The drawings show their nominal size and piping class. Missing data remain DN:HOLD and CLASS:HOLD; operating pressure is never substituted for design pressure. A missing fail action remains FA:HOLD even if the proposal catalog suggests a failure direction. Drive selection, valve sizing, proof testing, relief sizing, trip values and safety approval remain engineering inputs.

Auxiliary routes require explicit source and destination identities. For an existing process line, supply both physicalSourceEquipmentTag and physicalSourceStreamTag, with corresponding target fields for a recycle. For a new design nozzle, supply physicalSourceEquipmentTag, physicalSourceNozzleTag, physicalSourcePortRole (UTILITY or PROCESS) and designEvidenceReference; target-nozzle fields are symmetric. A new utility nozzle is a distinct owned plant object and is never connected to the process gas line by inference. destinationTag identifies a controlled external interface. A relief destination can name its generated off-page proposal tag.

A series circuit such as a utility SDV and TCV requires one shared physicalRouteId, identical endpoint/evidence inputs, and unique explicit nonnegative physicalRouteOrder integers. It generates one ordered physical path. Missing, duplicate or conflicting order remains HOLD; the exporter does not create a parallel bypass or invent a series order. Cooler/exchanger utility-loss flow measurement similarly requires its utility sensing point; it does not measure the hot process inlet. A simple fired-heater process low-flow proposal still uses its actual process inlet.

Process-nozzle synthesis excludes streams, valve piping nodes, tee helpers and numerical helpers. Their existing physical source ports remain in the engineering graph. Generic thermal duty models use the generic 2.0.1 HeatExchanger type; air-cooling or fired construction is selected only for an explicit source equipment type. Compatibility 2.0.0 mappings remain unchanged.

Native Process/PFD 2.0.1 export also supplies required compression/heat-exchange method values from the supported generic semantics. It no longer needs a notebook-side XML repair. An unspecified compression method is not silently labelled centrifugal from an isentropic-efficiency calculation.

The source-only native PFD overview uses the same authored equipment symbols, shows actual valves and stream pressure, temperature and mass flow, and omits proposed instrumentation. It currently supports small forward-flow trains with one to four primary units. Inspect pfdOverview in the readiness report and drawings/pfd-overview.layout.json; unsupported sizes are reported explicitly, and geometry errors are retained as incomplete drawings. This bounded overview does not establish arbitrary full-plant routing support.

Passive valves and splitters remain HAZOP nodes using their actual source stream boundaries. They do not receive invented vessel-nozzle proposals or automatically credited safeguards.

External symbol libraries, including PCA

The professional renderer currently uses NeqSim-authored vector families. The EngineeringDiagramConventionRegister records generic node-kind shapes and provenance; its sourceReference does not import SVG geometry, connection points or a PCA symbol. The professional scene calls ProfessionalPidSymbolLibrary directly. Keep that authored-symbol provenance unless an actual external asset has been acquired and its mapping verified.

The requested PCA symbol-library Members view identifies a library view, not a verified individual glyph. PCA documents Reader/Creator retrieval through GET /esl/engineeringSymbols as JSON, JSON-LD or Turtle. The API base depends on the deployment; use its returned access links and deployed Swagger schema rather than guessing a host, per-symbol IRI, payload fields or integer direction meanings. Preserve a resource’s canonical IRI separately from the environment-specific URL used to retrieve it. See the official API reference and retrieval guidance.

Before a future adapter is implemented, require this candidate acquisition record. It is an application-side evidence contract, not a claimed PCA payload schema:

Evidence Required content
Identity and status Exact resource/library IRIs, version and content status, replacement/deprecation information, acquisition date and access environment
Reproducible source Original representation, media type, SHA-256 and deployed schema version; server version/date metadata where supplied
Rights and provenance Resource-specific rights and attribution, applicable permission/agreement and review reference; no rights inferred from public visibility
Geometry Original shape/path data, dimensions/viewBox, coordinate units/axes, rotation centre and fill rule
Connections Original point IDs, coordinates and raw direction values, verified direction schema, and explicit mappings to canonical material/signal ports
Project mapping Source equipment class, symbol family, orientation/actuator/location semantics, supported transforms, mapping revision and review evidence

Apply one documented coordinate transform to the geometry, rotation centre and connection points, including the required unit and direction conversions. Keep the physical process and P&ID as the authority for material/signal connections; do not infer them from a picture. Validate actual hull/sensing attachments and both SVG and PDF output, then perform the applicable project and controlled symbol/standards review. Retain immutable source bytes for reproducible offline generation. See PCA’s geometry guidance.

No PCA glyph payload or resource-specific glyph licence has been verified here. Check the PCA terms and applicable resource rights before embedding or redistributing assets; this guide makes no licence decision. Until those prerequisites are met, retain the supported authored families and state that PCA glyphs have not been imported. Unknown families still fail closed. A library reference, reviewed project convention, PCA content status and ISO qualification are separate evidence; none establishes a safe control/safety design or a qualified receiving-tool round trip.

Compatibility proposal example

PidDesignModel pid = PidDesignSynthesizer.synthesize(project,
    new PidDesignBasis("NORSOK-COMPLETE-PID-PROPOSALS", "20"),
    NorsokPidRuleCatalog.completeProposals());

PidCompletenessReport completeness = PidCompletenessValidator.validate(pid);
PidHazopStudyReport hazopPreparation = PidHazopStudyRunner.run(project, pid);
PidEngineeringPackageExporter.ExportResult exported =
    PidEngineeringPackageExporter.export(project, pid, outputDirectory);

Implemented proposal scope

NorsokPidRuleCatalog.controlAndInstrumentation() proposes conventional ISA-style measurement and control loops for separators, compressors, pumps, heaters, coolers, and exchangers. Set points, ranges, failure actions, installation details, and control narratives remain project inputs.

NorsokPidRuleCatalog.completeProposals() adds process topology, equipment safeguarding, pressure relief, shutdown and isolation valves, non-return valves, blowdown, drains, and vents where the governed project basis supports them. The implemented rule families are independently reviewable and cover:

Separator level sensing belongs to the vessel and the total-level control valve belongs to the liquid/oil outlet. Three-phase separator proposals include a separate oil/water-interface transmitter/controller and a water-outlet control valve. These phase-specific paths still require the project instrument design, executable device bindings and reviewed control configuration.

Every proposal retains its source rule, engineering rationale, standards, requirement IDs, equipment identity, and graph connections.

Completeness and HAZOP preparation

PidCompletenessValidator checks tag uniqueness, references, connections, and minimum functional categories. PidHazopStudyRunner then prepares one traceable HAZOP node per physical process item, generates parameter/guide-word deviations, links matching proposed safeguards, reports unresolved connections, and leaves every workshop decision OPEN.

Streams provide node boundaries. Numerical Recycle, Calculator, and Adjuster helpers are excluded from physical HAZOP nodes and do not require safeguard proposals. Real equipment still requires P&ID coverage; a model containing only numerical helpers is not ready for a HAZOP workshop.

When PidSafetyStudies.run(...) has been applied, each deviation also lists quantifiedSafeguardEvidence: the calculated relief case and orifice, blowdown time and flare rate, trip set point and SIL screening of the safeguards credited for it. See Safety studies on a generated P&ID.

This is preparation for an IEC 61882 multidisciplinary workshop. It does not establish credible causes, consequences, IPL independence, residual risk, action closure, or approval. Reviewed outcomes can continue through the HAZOP and LOPA to Draft SRS Handoff.

Package contents

The package contains the native DEXPI document, Proteus and PyDEXPI exchange documents, pid-design-model.json, pid-completeness-report.json, and pid-hazop-study.json. Missing proposal tags are materialized into the compatibility documents: supported valve categories become piping components, while other proposals use instrumentation-function representations. These projections do not prove physical connection or complete native-model coverage. The sidecars preserve details that an exchange profile cannot represent losslessly.

The exporter refreshes the engineering package manifest after P&ID elements are materialized into the DEXPI and pyDEXPI documents.

The dual-profile reference delivery can also opt into source-linked P&ID proposal registers and completeness sidecars. That facade renders proposal overlays alongside the canonical PFD/P&ID drawings. Its exchange projection and full semantic equivalence remain separate checks; an overlay does not turn a proposed item into a connected native object or a live simulation device.

Status boundary

structurallyComplete means that references and minimum functional categories passed automated checks. readyForApproval remains false until discipline and HAZOP/LOPA review findings are closed. fitnessForConstruction is always false for generated proposals.

The executable notebook and its generated package are retained as GitHub Actions artifacts for independent review. The CI contract also runs Spotless and the focused P&ID test suite before rendering.

See the complete_pid_design_synthesis.ipynb notebook for the executable workflow.

Dynamic feedback and ISO 15519 review

The professional drawing profile declares ISO 15519-1:2010 (general process diagram rules) and ISO 15519-2:2015 (measurement and control) in its content report and identifies ISO 15519 in the sheet heading. These are review-basis references. standardsAssessment explicitly retains controlled-requirements review for both parts; isoConformanceStatus and construction fitness remain unchanged until the required engineering review is complete. A DEXPI 2.0.1 profile assessment does not establish ISO drawing conformance.

Bind an existing inlet shutdown valve to the actual valve and retain its owner-relative inlet attachment and stream identity. The professional PFD also shows that directly connected upstream valve. Additional actual outlet transmitters receive distinct sensing routes so they do not cross the vessel level-tap route. Check both process and sensing paths after binding changes.

A dynamic study can read candidate settings from PidDesignModel, construct a versioned scenario configuration, run strict PidSimulationSession tests, and attach result identities and checksums to a revised design. Numerical pressure-equality helpers belong to that declared scenario configuration; they are not physical P&ID equipment. Preserve base and configured source fingerprints, actual native bindings, rejected candidates and negative tests.

Retain settings, units, assumptions and tested effects in the canonical design and simulation-result sidecars with an explicit native-ID crosswalk. Native XML connectivity alone is not proof that controller parameters or safety logic round-trip into another CAE or control system. Native dynamic criteria that test first entry into a range by a deadline do not prove a whole-window envelope; use a horizon-gated accumulated predicate for that requirement. Proposed relief, blowdown and additional trips receive no test credit unless their actual executable effects were exercised.

A separator low-low-level proposal declares a liquid-outlet isolation/control route and leaves its final element as PROJECT_INPUT_REQUIRED until an applicable project target is supplied. It must not silently connect to the inlet shutdown valve, whose retained high-high-level action addresses a different hazard. A conventional liquid level control valve is not automatically an independent safety final element. Generic cause-and-effect requirement templates also need an explicit alias-to-canonical-tag crosswalk before they can be treated as executable device identities.

Actual passive PSV response

Use the passive PSV simulation and P&ID verification workflow when adding actual pressure relief. PidPressureReliefImporter extends the existing canonical model without a fictitious sensor, PLC signal or safety function. PidPressureReliefValidator requires exact actual valve/tee/stream identities, native mechanical readback and a registered capacity basis, then links strict executed cases to the frozen configuration fingerprint. Keep no-demand, incomplete, failed, relief-flow and reseat evidence distinct; preserve numerical balance verdicts independently from response verdicts. The initial supported capacity model is an explicitly synthetic US Cv assumption, not certified installed relief capacity.

Native DEXPI 2.0.1 SafetyValveOrFitting.SetPressureHigh uses a gauge-pressure unit. An absolute simulation setting is mapped only when the canonical proposal explicitly declares a positive simulationAtmosphericReferenceBara; the conversion and native unit are recorded in the projection crosswalk. No atmospheric default is inferred. Without that reference, leave the native gauge setting unassigned/HOLD and retain all absolute canonical parameters in the sidecar. SetPressureLow is a low-pressure activation property, not a PSV reseating setting.