DEXPI physics-bridge evaluation

Goal: NeqSim should be the strongest tool for connecting physics simulation to DEXPI. It should turn a simulation into a professional P&ID, and turn a P&ID into a runnable model for physics studies.

This page records an independent, executed evaluation of current master (21 November 2026) against that goal. It complements the current-master audit, which is a source inventory. Here every claim comes from running the code on a realistic case and, where possible, checking the output with an independent consumer (pyDEXPI 2.1.0).

Evaluation case

The evaluation used an HP/LP separation train with recompression: a 50 t/h well fluid feed (SRK, 12 components), an inlet heater, an HP separator, and a gas cooler and scrubber. It also has an export compressor (120 bara) and two liquid letdown valves into a mixer and the LP separator, an oil pump, and LP gas recompression recycled to the HP gas line through a Recycle. In total there are 17 units with one material recycle. A three-phase separator with a three-way splitter, and the official DEXPI example C01V04-VER.EX01.xml from a third-party tool, were used as extra cases.

Scorecard

Capability Result Evidence
Simulation to Proteus P&ID XML Good 17 units, 16 lines, operating P/T/flow on 31 items, design data, recycle closure kept; 0.2–0.4 s
Simulation to native DEXPI 2.0.1 Plant Good Schema/profile conformant; pyDEXPI strict load with 0 errors
Simulation to native DEXPI 2.0.1 Process Good Conformant and pyDEXPI-clean, including models with a single-stream Recycle (closed by stream identity)
Simulation to native DEXPI 2.0.0 Process Good Mandatory Method and DisplayText now written; pyDEXPI loads all steps with 0 issues; still no EngineeringModel provenance (no metadata in this API)
Simulation to native DEXPI 2.0.0 Plant Partial Heater exported as FiredHeater, which pyDEXPI rejects; GlobeValve attributes not in the model
Stream state in Process exchange Partial 19 streams with P, T and mass flow; no composition, so the file alone cannot be re-simulated
Quick Proteus drawing (DexpiXmlSvgRenderer) Not professional One 1.8 m-wide row; lines cross equipment; Recycle solver helper drawn as equipment
Native document-set P&ID view (EngineeringDiagramDelivery, PID profile) Not professional Labelled boxes in tag order on a grid, no ISO 10628 symbols, heavy line crossings; manifest still reports completeWithinDeclaredScope: true. Use the professional package below for P&IDs
Professional P&ID (ProfessionalPidPackageExporter) Was partial; improved See the drawing-standards results below
NeqSim Proteus P&ID to runnable simulation Was broken; fixed Before: 3 of 17 units missing, liquid routed as gas, 50 t/h duplicated feed, setpoints lost, run failed. After: identical results (see below)
Third-party P&ID to simulation Improved Before: disconnected units and a pump crash with no reason. After: connected flowsheet, recycle closed, isolation/check/safety valves handled, 4 missing specifications reported by tag
Native DEXPI 2.x to simulation Gap Not supported. Before: silently built a feed-only model. After: explicit error naming the supported route
Instrument and control-loop intake Partial C01 example: 4 instruments, 4 loops, 3 actuating functions read as metadata; not bound to NeqSim controllers on the actual valves

Round-trip fidelity after the fix

The 17-unit recycle train was exported with DexpiXmlWriter.write(...), rebuilt with DexpiSimulationBuilder, and run with the same fluid and feed:

Result Source model Rebuilt from DEXPI
HP separator gas / liquid 28 014 / 21 986 kg/h 28 014 / 21 986 kg/h
LP separator gas / liquid 2 668 / 21 935 kg/h 2 667 / 21 934 kg/h
Export compressor power 612.5 kW 612.5 kW
Recompressor power 145.0 kW 144.9 kW
Oil pump power 21.8 kW 21.8 kW
Inlet heater duty 205.6 kW 205.6 kW

The three-phase case also reproduced the 50/30/20 split from the exported branch flows, the water routing, and the pump power. A legacy file with the new port attributes removed rebuilt identically through the fallback rules.

Root causes found and fixed

  1. In-line valves broke every path through them. NeqSim writes a valve as a PipingComponent inside its line segment, and connections point at the valve’s own nozzles. The resolver mapped only equipment nozzles, so those connections were dropped and the valve disappeared. DexpiFlowsheetGraph now keeps valves with an operating outlet pressure as flowsheet units.
  2. Only the gas outlet was ever wired. The builder took getGasOutletStream(...) for every upstream unit, so separator liquid went to pumps as gas. Outlets are now resolved per connection (see below).
  3. Mixers kept one inlet. Disconnected units got a duplicate of the full feed, which doubled mass. All incoming connections are now wired, and duplicate feeds are reported.
  4. Setpoints were discarded. Exported operating outlet P and T were ignored; heaters defaulted to 100 °C and compressors to their inlet pressure, which gave negative power. They are now applied with unit conversion.
  5. Loops were not closed. Loops are now torn and closed with a Recycle.
  6. Splitters exported only their first branch. DexpiXmlWriter now writes one nozzle per branch, and the builder recovers split factors from branch flows.
  7. Nozzle phase was not exchanged. DexpiXmlWriter now writes a NeqSimPortAttributes generic-attribute set (PortRole, PortIndex) on every nozzle. Other tools can ignore it. For files without it, the builder falls back to the downstream unit type, then the nozzle height, then document order.

Regression coverage: DexpiSimulationRoundTripTest (5 tests, all of which fail on the previous builder). All 402 existing DEXPI/diagram tests and the engineering/P&ID tests still pass when run with the JVM module opens configured in the POM.

Professional P&ID drawing standards

The professional P&ID was rendered for the same 17-unit train and checked against ISO 10628-1/-2, ISO 5457, ISO 7200 and ANSI/ISA-5.1 drawing practice. The same automated rules were applied to the output before and after the change:

Finding on the 17-unit train Before After
Signal continuation flags pointing to their own sheet 77 0 (direct dashed signal lines)
Internal simulation names as line labels (gasOutStream, BL outStream) 25 0 (NORSOK-style line numbers with register)
Automated valves drawn without an actuator 12 0
Sheets without ISO 5457 grid and centring marks, or missing ISO 7200 fields 14 of 14 0
Drawing coverage errors (mixers and the Recycle helper) 6 0
PSVs, BDVs, vents and drains drawn (with opt-in standard connections) 0 (HOLD register) drawn on pooled auxiliary sheets
Level control valve in series with the modelled letdown valve 1 per separator 0 (modelled valve is the final element)
Sheets for the 17-unit train 14 (relief devices not drawn) 15 (relief devices drawn; auxiliary sheets pooled; heaters and coolers share a sheet)

The full convention table and the check codes are in Drawing conventions applied to every sheet. These are automated checks of implemented conventions, not an ISO certification: the symbol catalogue is NeqSim-authored, and controlled standards and discipline review remain required.

Simple heaters and coolers now share “Heat exchangers” sheets (up to three bands per A1 sheet), while separators and compressors keep their own sheet. On the 17-unit train this cuts the set from 17 to 15 sheets. A new PID_STANDARD_DRAWING_AREA check keeps every symbol inside the ISO 5457 frame; it caught header-tee continuation flags that started in the filing margin, which are now moved inside.

Also resolved: PSVs use the ISO 10628-2 angle-pattern body, nozzles are labelled N1, N2 with a nozzle register, manual valves show their normal position instead of a fail action, and plain mixers no longer receive nozzle proposals.

Physics studies on the generated P&ID

PidSafetyStudies now runs relief, blowdown, flare-load, trip set point and SIL screening studies on the proposed safeguards and writes the results back to the P&ID, the drawings, DEXPI 2.0.1 and the HAZOP preparation (details). On the 17-unit train it takes about 10 s and updates 29 elements:

Result Value
HP separator PSV set 64.9 barg, blocked outlet governs (27 400 kg/h), orifice J
LP separator PSV set 12.5 barg, gas blow-by through 20-LV-001 governs (4 170 kg/h, versus 2 090 kg/h blocked outlet and 3 110 kg/h fire), orifice H
Separator blowdown 8, 9 and 4 mm orifices reach the API 521 target in 805 to 890 s
Compressor blowdown (2 m3 declared) 7 mm; fluid falls to -58 C, flagged for the material check
Flare load 28 000 kg/h, set by the largest single relief case, not by simultaneous blowdown (4 300 kg/h)
Pressure and level trips SIL 2 (NOG 070) met at PFDavg 7.9e-3 with partial-stroke testing on the inlet ESD valve
HAZOP 32 deviations quote calculated safeguard evidence; the two mixer-node errors are gone

Open items are reported as findings, for example the HP liquid being supercritical at fire relieving pressure, compressor segment volumes, low-low level trips with no final element, and the letdown valve Cv taken from the model.

Remaining drawing gaps:

Roadmap to the goal

Ordered by how much each item blocks the goal.

Priority Item Why it matters
Done Recycle projection in the 2.0.1 Process writer; mandatory Method and DisplayText in the 2.0.0 Process path Verified with neqsim dexpi-check: NeqSim CONFORMANT and pyDEXPI 0 issues on the 17-unit recycle train
P2 Bundle the 2.0.0 model files and run the model-level multiplicity validator on the 2.0.0 path The NeqSim assessment still cannot see 2.0.0 multiplicity defects; pyDEXPI (neqsim dexpi-check) is the independent guard
P1 Native DEXPI 2.0.1 Plant and Process import into ProcessSystem, reusing the flowsheet graph and diagnostics Modern CAE tools exchange 2.0.1; pyDEXPI already reads NeqSim’s 2.0.1 output, but NeqSim does not
P1 Export the fluid definition (composition, EoS reference) with Process streams Lets a DEXPI file alone carry enough to re-run the physics
P3 Professional P&ID: utility-system input for cooler control valves ISO frame, title block, ISA symbols, direct signals, line numbers, relief connections, nozzle labels, pooled auxiliary sheets and shared heat-exchanger sheets are done
P2 Make delivery manifests fail-closed on visual quality: no completeWithinDeclaredScope: true for an unrouted box diagram Prevents overstated claims in engineering packages
P2 Bind DEXPI control loops to NeqSim controllers on the named final element (for example PICSA 4712.02 to PV4712.02) Turns the P&ID into a dynamic model rather than category-renamed auto-instrumentation
P2 Consistent heater mapping across profiles (heat exchanger unless fired) FiredHeater and HeatingInFurnace misdescribe topsides heaters
P2 Flare network hydraulics and radiation from the study loads; two-phase relief; ESD valve closure-time verification PidSafetyStudies delivers loads, orifices and set points; the disposal system itself is not yet calculated
P3 Named-tool round-trip qualification (for example AVEVA, Hexagon, COMOS) with recorded evidence Required before any interoperability claim

Reproduce

The scorecard numbers come from small Java drivers that build the evaluation case, export through DexpiXmlWriter, Dexpi20XmlWriter, Dexpi201XmlWriter, Dexpi20ProcessModelWriter, Dexpi201ProcessModelWriter and EngineeringDiagramDelivery, and rebuild with DexpiSimulationBuilder. Independent checks used pydexpi.loaders.public.load_xml_with_report(..., strict=True) from pyDEXPI 2.1.0. DexpiSimulationRoundTripTest contains the executable form of the round-trip results.