Safety Systems Documentation
Documentation for safety-related features and systems in NeqSim.
Overview
This folder contains guides for implementing safety systems in process simulations, including Emergency Shutdown (ESD), High Integrity Pressure Protection Systems (HIPPS), blowdown analysis, and alarm management.
Documentation Index
Emergency Shutdown (ESD)
HIPPS (High Integrity Pressure Protection)
Safety Architecture
Standards Compliance and Hazard Screening
| Document |
Description |
| NOG 070 SIL, STS-0131 Gate and ESD Response Time |
Pre-determined SIL (NOG 070), aggregated STS-0131 acceptance gate, and IEC 61511 ESD response-time budget |
| API 14C SAFE Chart and NORSOK P-002 Compliance |
API RP 14C / ISO 10418 SAFE chart, NORSOK P-002 flare/blowdown/vent screening, and coupled multi-vessel blowdown header load |
| ISO 17776 MAH Bow-Tie and EI AVIFF FIV Screening |
Major-accident-hazard bow-tie from the ISO 17776 catalogue and Energy Institute AVIFF flow-induced-vibration screening |
| Flare Flame, Hazardous Area and PFP Demand |
API 537 flare flame/radiation/noise, IEC 60079-10-1 hazardous-area zoning, and API 521 passive-fire-protection demand |
| Automated HAZOP from STID and Simulation |
End-to-end STID/P&ID, plant data, NeqSim simulation, HAZOP, barrier, and report workflow |
| AI-HAZOP Input Data Format |
Required input-data format for a P&ID Safety Analyser / AI-HAZOP front-end: process model JSON, per-deviation runHazopScenario request, DEXPI design-conditions, limit-basis policy, and blocked-outlet overpressure screening |
| Open Drain Review with NeqSim Evidence |
NORSOK S-001 Clause 9 review using NeqSim-calculated liquid leak rate, firewater load, density, pressure, and drain capacity plus STID/tagreader evidence |
Fire and Thermal Protection
Relief Systems
| Document |
Description |
| Trapped Inventory Calculator |
Evidence-linked trapped inventory for isolation, blowdown, flare-load, and MDMT screening |
| Trapped Liquid Fire Rupture |
Fire exposure, thermal expansion, pipe/flange failure screening, PFP demand, and source-term handoff |
| Blocked-In Liquid Thermal Expansion |
Isochoric pressure-rise screening and simplified beta/kappa relation for blocked-in liquid thermal relief screening |
| psv_dynamic_sizing_example.md |
Pressure Safety Valve dynamic sizing |
| Vessel Thermomechanical Safety |
Dynamic PSV sizing vs steady-state API 521 conservatism, plus blowdown, filling, boil-off, and rupture models |
| rupture_disk_dynamic_behavior.md |
Rupture disk dynamic behavior |
Alarms